Preparing to replace suspension bridge, Strong, ca. 1921

Contributed by Strong Historical Society

Preparing to replace suspension bridge, Strong, ca. 1921

Purchase a reproduction of this item on VintageMaineImages.com.

Description

In preparation of replacing it, a new south abutment is laid of concrete under the old bridge, allowing it to still be used. The sheathing has been removed from the north tower, exposing its structure.

A one-lane floating bridge was built across the Sandy River about a mile downstream to detour traffic during construction when the old bridge was removed.

View/Add Comments


About This Item

  • Title: Preparing to replace suspension bridge, Strong, ca. 1921
  • Creator: Lester Royal Lewis
  • Creation Date: circa 1921
  • Subject Date: circa 1921
  • Location: Strong, Franklin County, ME
  • Media: Photographic print
  • Dimensions: 8.6 cm x 14.3 cm
  • Local Code: ED.01.103.686
  • Collection: L. R. Lewis Collection
  • Object Type: Image

Cross Reference Searches

Standardized Subject Headings

Other Keywords


For more information about this item, contact:

Strong Historical Society
PO Box 133, Strong, ME 04983
(207) 684-3613
Website

The copyright and related rights status of this item have not been evaluated. Please contact the contributing repository for more information.

How to cite content on this site


Please post your comment below to share with others. If you'd like to privately share a comment or correction with MMN staff, please send us a message with this link.