Contributed by Maine Historical Society
- MMN #23395
- print page
- download web image
Purchase a reproduction of this item on VintageMaineImages.com.
Description
The Cumberland County Power & Light station on the Saco River at Bonny Eagle in about 1921.
Portland Electric Co. set up the first hydro project at the falls in 1908.
About This Item
- Title: Cumberland County Power & Light, Bonny Eagle, ca. 1921
- Creation Date: circa 1921
- Subject Date: circa 1921
- Location: Bonny Eagle, Buxton, York County, ME
- Media: Photographic print
- Dimensions: 6.5 cm x 12 cm
- Local Code: Photographs--Buxton
- Object Type: Image
Cross Reference Searches
Standardized Subject Headings
- Cumberland County Power and Light Co.
- Hydroelectric power--Maine--Bonny Eagle
- Power industry--Maine--Bonny Eagle
- Power plants--Maine--Bonny Eagle
- Rivers--Maine
- Saco River (N.H. and Me.)
For more information about this item, contact:
Maine Historical Society485 Congress Street, Portland, ME 04101
(207) 774-1822 x230
Website
The copyright and related rights status of this item have not been evaluated. Please contact the contributing repository for more information.
Please post your comment below to share with others. If you'd like to privately share a comment or correction with MMN staff, please send us a message with this link.