Contributed by Lubec Historical Society
Description
This peaceful scene shows a completed earth and rock approach calmly waiting for construction of a bridge between Lubec and Campobello Island to commence. This view of Campobello was taken across the channel from Lubec.
About This Item
- Title: Earth and rock approach awaiting new bridge, Lubec, ca. 1961, ca. 1961
- Creation Date: circa 1961
- Subject Date: circa 1961
- Location: Lubec, Washington County, ME
- Media: Photographic print
- Dimensions: 7.4 cm x 9.7 cm
- Local Code: Bridge 6C jpg
- Collection: Bernard Ross
- Object Type: Image
Cross Reference Searches
Standardized Subject Headings
- Bridge construction--Maine--Lubec
- Bridge construction--Canada--New Brunswick
- Road construction
- Bridges--Canada--New Brunswick
- Bridges--Maine
Other Keywords
For more information about this item, contact:
Lubec Historical Society135 Main Street, Lubec, ME 04652
This Item is protected by copyright and/or related rights. No Permission is required to use the low-resolution watermarked image for educational use, or as allowed by the applicable copyright. For all other uses, permission is required.
Please post your comment below to share with others. If you'd like to privately share a comment or correction with MMN staff, please send us a message with this link.