Tidal project dam construction, Carlow Island, 1936, 1936

Contributed by National Archives at Boston

Description

Men are working with wagon drills in the quarry on Carlow Island at Eastport for the Pleasant Point Dam in 1936.

The dam was part of the Passamaquoddy Tidal Power Project. The project, a long-time desire of Dexter Cooper and others, intended to make use of the large ocean tides in Passamaquoddy Bay.

Two dams were planned. Federal funding for the project lasted only one year.

View/Add Comments


About This Item

  • Title: Tidal project dam construction, Carlow Island, 1936, 1936
  • Creator: War Department. Office of the Chief of Engineers. Boston District.
  • Creation Date: 1936-05-25
  • Subject Date: 1936-05-25
  • Location: Carlow Island, Eastport, Washington County, ME
  • Media: Photographic print
  • Local Code: ARC # 1112025, Box P-D 001, 13/10/10-1
  • Collection: Record Group 77: Office of the Chief of Engineers; Passamaquoddy Tidal Power Project Photographs
  • Object Type: Image

Cross Reference Searches

Standardized Subject Headings

Other Keywords


For more information about this item, contact:

National Archives at Boston
380 Trapelo Road, Waltham, MA 02452
(781) 663-0144
Website

This Item is protected by copyright and/or related rights. No Permission is required to use the low-resolution watermarked image for educational use, or as allowed by the applicable copyright. For all other uses, permission is required.

How to cite content on this site


Please post your comment below to share with others. If you'd like to privately share a comment or correction with MMN staff, please send us a message with this link.