Contributed by Strong Historical Society
- MMN #68680
- print page
- download web image
Purchase a reproduction of this item on VintageMaineImages.com.
Description
In preparation of replacing it, a new south abutment is laid of concrete under the old bridge, allowing it to still be used. The sheathing has been removed from the north tower, exposing its structure.
A one-lane floating bridge was built across the Sandy River about a mile downstream to detour traffic during construction when the old bridge was removed.
About This Item
- Title: Preparing to replace suspension bridge, Strong, ca. 1921
- Creator: Lester Royal Lewis
- Creation Date: circa 1921
- Subject Date: circa 1921
- Location: Strong, Franklin County, ME
- Media: Photographic print
- Dimensions: 8.6 cm x 14.3 cm
- Local Code: ED.01.103.686
- Collection: L. R. Lewis Collection
- Object Type: Image
Cross Reference Searches
Standardized Subject Headings
Other Keywords
For more information about this item, contact:
Strong Historical SocietyPO Box 133, Strong, ME 04983
(207) 684-3613
Website
The copyright and related rights status of this item have not been evaluated. Please contact the contributing repository for more information.
Please post your comment below to share with others. If you'd like to privately share a comment or correction with MMN staff, please send us a message with this link.