Contributed by Strong Historical Society
- MMN #68682
- print page
- download web image
Purchase a reproduction of this item on VintageMaineImages.com.
Description
Two explorers survey the top of the wing of the new bridge abutment in Strong. Given time for the concrete to properly cure, the old bridge will then be removed and construction will begin on the new iron bridge.
About This Item
- Title: North abutment and wing completed under the old bridge, Strong, ca. 1921
- Creation Date: circa 1921
- Subject Date: circa 1921
- Location: Strong, Franklin County, ME
- Media: Photographic print
- Dimensions: 8.5 cm x 12.8 cm
- Local Code: ED.01.066.179
- Object Type: Image
Cross Reference Searches
Standardized Subject Headings
Other Keywords
For more information about this item, contact:
Strong Historical SocietyPO Box 133, Strong, ME 04983
(207) 684-3613
Website
The copyright and related rights status of this item have not been evaluated. Please contact the contributing repository for more information.
Please post your comment below to share with others. If you'd like to privately share a comment or correction with MMN staff, please send us a message with this link.