Portland Water District work, Sebago Lake, 1924

Contributed by Maine Historical Society/MaineToday Media

Portland Water District work, Sebago Lake, 1924

Purchase a reproduction of this item on VintageMaineImages.com.

Description

In 1924, the Portland Water District started construction to upgrade intake from Sebago Lake. The builders increased the intake depth from several feet to 30 feet, and moved it to 1600 feet from shore. "....if by any chance the dam at the lower end of the lake should go out, there would still be sufficient depth of water over the pipe to maintain the supply for the district." The project used machinery wherever possible, since labor was scarce and expensive.

The December 9th edition of the "Portland Evening Express" devoted a full-page article to the project.

View/Add Comments


About This Item

  • Title: Portland Water District work, Sebago Lake, 1924
  • Creation Date: 1924
  • Subject Date: 1924
  • Location: Sebago Lake, Cumberland County, ME
  • Media: Glass Negative
  • Dimensions: 8.3 cm x 10.8 cm
  • Local Code: Coll. 1949, 2005.061.9380
  • Collection: Portland Press Herald glass negative collection
  • Object Type: Image

Cross Reference Searches

Standardized Subject Headings

Other Keywords


For more information about this item, contact:

Maine Historical Society/MaineToday Media
489 Congress Street, Portland, ME 04101
(207) 774-1822 x230
Website

This Item is protected by copyright and/or related rights. No Permission is required to use the low-resolution watermarked image for educational use, or as allowed by the applicable copyright. For all other uses, permission is required.

How to cite content on this site


Please post your comment below to share with others. If you'd like to privately share a comment or correction with MMN staff, please send us a message with this link.