Contributed by Maine Historical Society
- MMN #74733
- print page
- download web image
Purchase a reproduction of this item on VintageMaineImages.com.
Description
Completed in 1955, Harris Station was the largest hydroelectric dam in Maine at the time.
Its initial capacity of 75,000 kilowatts was later upgraded to 88,000.
The dam raised the level of Indian Pond by 20 feet, increasing the surface area from 2 to 5½ square miles.
About This Item
- Title: Harris Dam and hydro station, Indian Pond, ca. 1955
- Creation Date: circa 1955
- Subject Date: circa 1955
- Location: Greenville, Harris County, ME
- Media: Photographic print
- Local Code: 2004.090.0004
- Collection: Central Maine Power Company collection
- Object Type: Image
Cross Reference Searches
Standardized Subject Headings
Other Keywords
For more information about this item, contact:
Maine Historical Society485 Congress Street, Portland, ME 04101
(207) 774-1822 x230
Website
This Item is protected by copyright and/or related rights. No Permission is required to use the low-resolution watermarked image for educational use, or as allowed by the applicable copyright. For all other uses, permission is required.
Please post your comment below to share with others. If you'd like to privately share a comment or correction with MMN staff, please send us a message with this link.