Mt. Zircon Resevoir construction, Rumford, 1914

Contributed by Greater Rumford Area Historical Society

Mt. Zircon Resevoir construction, Rumford, 1914

Purchase a reproduction of this item on VintageMaineImages.com.

Description

A crew is in the process of constructing an approximately 100-foot long bridge from the top of the dam to the gatehouse at the Mt. Zircon Resevoir in Rumford. The impact of winter’s ice on the gatehouse was one of a number of special considerations addressed in a report by Sawyer & Moulton, a Boston engineering firm that was consulted on resevoir operations.

View/Add Comments


About This Item

  • Title: Mt. Zircon Resevoir construction, Rumford, 1914
  • Creation Date: 1914-07-24
  • Subject Date: 1914-07-24
  • Location: Rumford, Oxford County, ME
  • Media: Photographic print
  • Object Type: Image

Cross Reference Searches

Standardized Subject Headings

Other Keywords


For more information about this item, contact:

Greater Rumford Area Historical Society
145 Congress Street, Rumford, ME 04276
(207) 364-2540

The copyright and related rights status of this item have not been evaluated. Please contact the contributing repository for more information.

How to cite content on this site


Please post your comment below to share with others. If you'd like to privately share a comment or correction with MMN staff, please send us a message with this link.