Interior of first electric generating plant, Lubec, ca. 1903, ca. 1903

Contributed by Lubec Historical Society

Description

Pictured here is Lubec’s first commercial electric power plant. The generator is in the center, belted to a coal-fired steam engine. This was a private facility built by and for the fishing industry and it was located amid the the Water Street packing plants.

According to the trade journal “Electrical World,” Volume 75 #11 (March 1920), the Town of Lubec Commissioners “have been authorized to construct a municipal electric light and power plant.” Locally generated electricity then powered Lubec for about eighty years until, according to the Bangor Daily News for August 2, 1990, the Bangor Hydro Electric Company bought the system.

View/Add Comments


About This Item

  • Title: Interior of first electric generating plant, Lubec, ca. 1903, ca. 1903
  • Creation Date: circa 1903
  • Subject Date: circa 1903
  • Location: Lubec, Washington County, ME
  • Media: Photographic print
  • Dimensions: 12.2 cm x 19.7 cm
  • Local Code: 646 jpg
  • Collection: Bernard Ross
  • Object Type: Image

Cross Reference Searches

Standardized Subject Headings


For more information about this item, contact:

Lubec Historical Society
135 Main Street, Lubec, ME 04652

The copyright and related rights status of this item have not been evaluated. Please contact the contributing repository for more information.

How to cite content on this site


Please post your comment below to share with others. If you'd like to privately share a comment or correction with MMN staff, please send us a message with this link.