Contributed by Monson Historical Society
- MMN #80896
- print page
- download web image
Purchase a reproduction of this item on VintageMaineImages.com.
Description
The Monson Narrow Gauge Railroad company began construction in the spring of 1883 with $70,000 in Capital Stock. By September 4, 1883 the first train arrived at the Monson Station and the Company continued operations until 1943.
Engines No. 1 and 2 were built by Hinckley and weighted 28,000lb each. Later No. 1 would become a rebuilt snowplow/flanger after the engine house fire in 1919. Engines 3 (shown in this photograph) and 4 were heavier in weight and able to haul up to four loaded cars and were built by the Vulcan Company.
The "bumper" shown on the front of the engine was a link & pin coupler which was used as the engine pushed/pulled the cars back to the Monson station from Monson Junction. The Monson station had a turntable but it would not accommodate the sizes of engines 3 and 4.
About This Item
- Title: The No. 3 Engine, Monson, ca. 1930
- Creation Date: circa 1930
- Subject Date: circa 1930
- Location: Monson, Piscataquis County, ME
- Media: Photographic print
- Dimensions: 9.2 cm x 14.5 cm
- Local Code: MHS-111-046
- Object Type: Image
Cross Reference Searches
Standardized Subject Headings
- Locomotives--Maine--Monson
- Monson Railroad Company
- Monson Railroad Company--Photographs
- Railroads--Maine--Monson
Other Keywords
For more information about this item, contact:
Monson Historical SocietyPO Box 308, Monson, ME 04464
(207) 876-3073
This Item is protected by copyright and/or related rights. No Permission is required to use the low-resolution watermarked image for educational use, or as allowed by the applicable copyright. For all other uses, permission is required.
Please post your comment below to share with others. If you'd like to privately share a comment or correction with MMN staff, please send us a message with this link.